Tuesday, July 7, 2015

It's been a very long time since our last update.  Here are new pictures showing the current state of things.  You can see that the crown moulding is in, all of the painting (in the kitchen) is finished, and the tile work is done.  Three long days of tiling, but we like how it turned out.
 



The bakeware drawer is in and holds quite a bit.  It does make the upper oven a little high for the vertically challenged in the house; but we can live with it.
 
  The half bath that is just off the kitchen:  Before on the left, now on the right.  We still need to change the light fixture and probably the mirror.
 


Longer shots to show the moulding a little better.  Over 25 corners for the trim to turn and neither the ceiling or floor are level.  Two pieces of trim at the ceiling and two at the floor.  Two cuts for each miter at each corner.  That adds up to ... a hell of a lot of cutting and fitting.  Again though, we like how it has turned out.




 
 
Obviously still have to make the drawer fronts and doors.  That's next....