Monday, January 26, 2015

Deconstruction

The contractor was kind enough to set up plastic zip walls to protect other areas of the house. 






Having a toilet in the middle of the kitchen is the newest design trend.


Demolition a little further along.  The ducts in the middle will be re positioned out of the center of the room.  Unfortunately the beam on either side of the ducts shows that space is load bearing, so we have to do some re-engineering to remove it and achieve a flat ceiling between the two spaces.